Main stages of repair in the apartment.
How to start repair works of the apartment?
The first phase of the repair of old houses is the destruction and dismantling first of all of the shabby walls and partition walls, eliminating the wall and ceiling finishing. This stage is among the most "unclean" phases of the repair.
One more amongst the most essential and "dirty" works is the window block replacement. It is essential to do this first off due to the fact that dirt and dust will be unallowable during following stages and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is necessary to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following phase is wiring. Electrical wiring can be set up in walls or along the flooring. Circuitry is made inside the pipes to ensure electrical safety and boost reliability. The pipeline protects wiring from external damages and allows to replace the wire completely without breaking walls and flooring just by inserting the brand-new wire rather of the old one.
House Painting follows the electrical wiring. The frequent mistake throughout the synchronised conducting of such works takes place when workers forget to set out among the cable televisions and house painters have actually currently plastered and ravelled the wall. As a result, additional works are needed to seal chases on the completed wall. The places of the feed switch and wall outlet location and their number should be thought-out in advance. The plan of power circuitry is normally included into the design project.
Later on the system need to be all set to service in case of failures. In addition to the circuitries, the telephone cable television and the TV cable television are laid out. The power cable should not be set out near the telephone and antenna cable televisions to avoid sound pickup and disturbance. The most peculiar moment is laying affordable plumber Canberra out the TV cable. In order to make 2 (or 3) TV sets in the house the second cable television is frequently just "firmly soldered" in parallel, so the cable television resistance is decreased. As an outcome, the display screen quality is weakened, lots of programs can't be gotten and etc. In order to prevent such situation it is necessary to invite a professional with unique devices. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is carried out at the same time in all properties, if it is possible. Hold-ups are linked with the technology. Each applied layer of the plaster (or filling out finishing) should dry totally before the work will continue.

Then works in sanitary arrangements are conducted according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.
After electrical wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this stage in order to save their surface appearance. The finish puttying of walls is carried out at the same time. The highly precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures wetness of the material.
The following phase is the procedure of fill. Fill can be made with various materials-- from typical masonry cement-sand mixture to self-aligning floorings. The benefit of the easy mix is its cheapness, the disadvantage is that such mixture is much more difficult lined up at the level and the final dry time of such fill is 40 days, only then the next phase of the deal with flooring can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are far more expensive, but more technological. Lining up takes place almost "instantly" i.e. fluid solution of mix is put out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floorings with adjustable flooring battens plumber Canberra are mounted.
After fill door boxes and door are set up. Setup of doors need to take into the account density of future floor covering. After setup the door can be removed its hinges and removed up until the end of repair work or packed into polyethylene film to secure from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile needs to be laid on the definitely dry overlay.
Finishing of the floor installing depends upon the planned covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-term service of the floor without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.
In properties where surface covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.
If finish covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The discussed repercussion is connected just with such rushing process when the great amount of dust is developed. In spite of the reality that good flooring grinders are geared up with the vacuum cleaner, the enough quantity of dust is sped up on surrounding subjects including walls. Dust is extremely acerbic and is severely washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be completed. It is left only to install the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is essential to note that the series of works was listed in basic and can change depending upon the certain situation-- the variety of rooms in facility, your resources, peculiarities of the building and construction of the multilevel facilities. It is based on good sense and every person efficient in analysis can individually produce such a series.